On Wed, Jan 28, 2009 at 12:43 AM,  <craigdo at ee.washington.edu> wrote:
>
>> Thanks for the summary Craig.  Any update?
>
> Getting close.  I have pretty much all the pieces put together; but there's
> a lot of testing to be done and a complete demo to put together.  I'm sure
> there's missing doxygen.
>
> I'm obviously not going to meet your milestone "January 27 -- Deadline for
> new feature submissions that require design review" deadline, though, since
> that is two and a half hours away in PST.
>
> How flexible are you on this one?  If I can get it to you in the next couple
> of days are you still willing to consider it?
>

I am flexible in this case.  Given that the late merge ends in about
two weeks, and that we have seen some information from you about tap,
AND that it is a "targeted feature", I would say that we could move
forward with merging if it is reviewable within a few days (say
early-mid next week).  One aim of these early deadlines, as I'm sure
you know, is to have concrete API everyone is okay with.

> Don't tell anyone, but just between you and me and the fly on the
> wall.isi.edu, I have been known to check something in to meet a deadline and
> then file a bug saying it doesn't work at all.  Then I finish it during bug
> fixing time :-)

Is what you have API stable according to your liking?  If so, I
suggest we start reviewing it from a UI perspective as you check in
changes.  Your changes are being tracked in this tree:

http://code.nsnam.org/craigdo/ns-3-tap/

Correct?


-- 
Raj Bhattacharjea
Georgia Institute of Technology
School of Electrical and Computer Engineering
Ph.D. Candidate
Systems Analyst
404.894.2955


More information about the Ns-developers mailing list