[Ns-developers] suggested project 1(Performance Evaluation and Optimization)
longlong
asfnuts at gmail.com
Thu Apr 3 08:47:50 PDT 2008
2008/4/3, Raj Bhattacharjea <raj.b at gatech.edu>:
>
> On Wed, Apr 2, 2008 at 9:08 PM, xiaohui sun <sunxiaohui.bj at gmail.com>
> wrote:
> > 2008/4/2, longlong <asfnuts at gmail.com>:
> >
> >
> > >
> > > hi
> > >
> > > I was a little confused:
> > > Is the work for this project contain the implement of Calendar Queue
> and
> > > DCQ? I think it's too much for a student in three month.
> >
> >
> > Actually there are quite some sample code that could be used as a
> > reference IMHO.
> > DCQ has been integrated into ns-2 :)
> >
>
>
> +1
>
> IMO a portion of this project would consist of looking at the ns-2
> implementation of DCQ, then looking at the other schedulers already in
> ns-3, and then somewhat porting the ns-2 implementation to work with
> the ns-3 framework.
>
> The other large portion of this (and arguably the more open ended one)
> is to come up with some performance metrics (time), come up with some
> real test cases, and do some profiling between the schedulers.
>
> I suspect a bright student could indeed achieve these goal in three
> months.
>
>
> --
> Raj Bhattacharjea
> Georgia Institute of Technology
> School of Electrical and Computer Engineering
> Systems Analyst
> 404.894.2955
>
looks like i have been distractived by the less significant part. I know
what to do now.
More information about the Ns-developers
mailing list