Raj Bhattacharjea raj.b at gatech.edu
Thu Apr 3 08:27:43 PDT 2008


On Wed, Apr 2, 2008 at 9:08 PM, xiaohui sun <sunxiaohui.bj at gmail.com> wrote:
> 2008/4/2, longlong <asfnuts at gmail.com>:
>
>
> >
>  > hi
>  >
>  > I was a little confused:
>  > Is the work for this project contain the implement of Calendar Queue and
>  > DCQ? I think it's too much for a student in three month.
>
>
>  Actually there are quite some  sample code that could be  used as a
>  reference IMHO.
>  DCQ has been integrated into ns-2 :)
>

+1

IMO a portion of this project would consist of looking at the ns-2
implementation of DCQ, then looking at the other schedulers already in
ns-3, and then somewhat porting the ns-2 implementation to work with
the ns-3 framework.

The other large portion of this (and arguably the more open ended one)
is to come up with some performance metrics (time), come up with some
real test cases, and do some profiling between the schedulers.

I suspect a bright student could indeed achieve these goal in three months.

-- 
Raj Bhattacharjea
Georgia Institute of Technology
School of Electrical and Computer Engineering
Systems Analyst
404.894.2955